Correct Answer: Correct answer is: (B) An SVC.
Exam Relevance: CCNA, Network+, CompTIA Network+
Difficulty: Moderate
Concept notes: In Frame Relay, SVCs (Switched Virtual Circuits) require the establishment and termination phases, whereas PVCs (Permanent Virtual Circuits) do not.
Common Mistakes: Students often confuse PVCs and SVCs, thinking that both require the same setup procedures.
Explanations: SVCs in Frame Relay are dynamically established and terminated on demand. This means that when a connection is needed, the network establishes the SVC, and when the communication is complete, the SVC is terminated. PVCs, on the other hand, are pre-configured and always available, so they do not require the establishment and termination phases.
Option Analysis: - Option A: PVCs do not require the establishment and termination phases as they are pre-configured.
- Option B: SVCs require the establishment and termination phases as they are dynamically created and removed.
- Option C: This option is incorrect because only SVCs require the establishment and termination phases.
- Option D: This option is incorrect because SVCs do require the establishment and termination phases.
Mnemonic: SVCs: Set Up, Connect, Disconnect